• 2020

    First Gen 3 latch SOP

  • 2019

    VAST(Jing Zhou) groundbreaking

    Successful launch of SAP system

  • 2017

    First flush door handle SOP

    The first ESCL program (SGM Alpha ESCL) is launched into production

  • 2016

    First SOP to Volvo Asia-pacific plant

  • 2015

    First Gen 2 latch SOP

    VCN factory construction of phase II

  • 2013

    Formal production of door handle

  • 2011

    Opening of the third facilities in Taicang

  • 2009

    VAST owns 100% shares

  • 2006

    ADAC joined the alliance. Renaming as VAST

  • 2005

    First SOP to CAF

    First SOP to SVW

  • 2004

    First SOP to SGM

    VAST second plant in China was established in Kunshan

  • 2002

    WITTE-STRATTEC started its business in Fuzhou China

  • 2000

    Foundation of VAST, named WITTE-STRATTEC